Client: Santos GLNG
Date: 2015
HITEC Welding fabricated and assembled the remaining/balance (53) skids for Roma West Phase 2A.
Scope of work and supply includes:
- Design and Engineering (Mechanical, Structural, Piping, Electrical and Instrumentation)
- Procurement of all materials
- Fabrication (Piping, structural and MCC/RTU panels)
- Assembly
- Installation and wiring of instruments and actuated valves
- Installation and wiring of MCC/RTU panels on skids
- IFAT (Integrated Factory Acceptance Testing) of the whole skid
- Packaging for delivery