Client: Santos GLNG
Date: 2016
Fabrication, assembly, wiring and testing of Lean Skid Separators, Lean Multi Skids and 2-Pipe Skids.
HITEC Welding has been awarded the fabrication, assembly, wiring & installation and testing for the following Santos skids:
Lean Skid Integrated Separator Skids (LS1.1 x 43 skids)
Lean Multi Skids
- Separator Skids (LMS1.1-SEP x 24 skids)
- Metering Skids (LMS1.1-MET x 65 skids)
- Electrical Skids (LMS1.1-ELEC x 24 skids)
- Pipe Modules Type 1, 2 & 3 (LMS1.1-PM x 41 skids)
2-Pipe Skids (2PS1.1 x 41 skids)
Scope of work and supply includes:
- Fabrication (Piping, structural)
- Procurement
- Assembly
- Installation and wiring of instruments and actuated valves
- Installation and wiring of MCC panels, RTU panels, Battery chargers and batteries, VSD panel
- IFAT (Integrated Factory Acceptance Testing) of the skids
- Packaging and loading