Quality

Australian Supplier

Certified

ISO 9001: 2015

Leading Provider

Of Industrial Solutions

Quality

Australian Supplier

Certified

ISO 9001: 2015

Leading Provider

Of Industrial Solutions

RM2B Roma West Phase 2B Skids

Client: Santos GLNG

Date: 2016

Fabrication, assembly, wiring and testing of Lean Skid Separators, Lean Multi Skids and 2-Pipe Skids.

HITEC Welding has been awarded the fabrication, assembly, wiring & installation and testing for the following Santos skids:

Lean Skid Integrated Separator Skids (LS1.1 x 43 skids)

Lean Multi Skids

  • Separator Skids (LMS1.1-SEP x 24 skids)
  • Metering Skids (LMS1.1-MET x 65 skids)
  • Electrical Skids (LMS1.1-ELEC x 24 skids)
  • Pipe Modules Type 1, 2 & 3 (LMS1.1-PM x 41 skids)

2-Pipe Skids (2PS1.1 x 41 skids)

Scope of work and supply includes:

  • Fabrication (Piping, structural)
  • Procurement
  • Assembly
  • Installation and wiring of instruments and actuated valves
  • Installation and wiring of MCC panels, RTU panels, Battery chargers and batteries, VSD panel
  • IFAT (Integrated Factory Acceptance Testing) of the skids
  • Packaging and loading