Client: Santos GLNG
Date: 2015
Fabrication and assembly of 2 separator skids, including E&I; installation and wiring on skid, and 2 RTU panels, complete with batteries and solar panels.
HITEC Welding fabricated, supplied, installed, assembled and tested the RDPP skids for Santos GLNG.
Each package consist of the following:
- Separator Skid
- RTU Skid
- Instruments and actuated valves
- Satellite panel, bracket and system
- Solar panels and regulator
- Batteries
- Skid’s Junction Box
- Cabling and cable tray/ladder