Rapid Deployment Production Package (RDPP) Skids

Client: Santos GLNG

Date: 2015

Fabrication and assembly of 2 separator skids, including E&I; installation and wiring on skid, and 2 RTU panels, complete with batteries and solar panels.

HITEC Welding fabricated, supplied, installed, assembled and tested the RDPP skids for Santos GLNG.

Each package consist of the following:

  • Separator Skid
  • RTU Skid
  • Instruments and actuated valves
  • Satellite panel, bracket and system
  • Solar panels and regulator
  • Batteries
  • Skid’s Junction Box
  • Cabling and cable tray/ladder