Client: Santos GLNG
Date: 2014
HITEC Welding fabricated SANTOS Fairview Infill – Multi Wells skids including Separator Skids, Metering Skids, Pipe Modules, off‐skid piping and lease and flow line risers. Including E&I; installation on skids:
– FV11‐31 – 1‐off Separator skid, 4‐off Metering Skids, 3‐off Pipe Modules Skids
– FV11‐33 – 1‐off Separator skid, 2‐off Metering Skids, 1‐off Pipe Module Skid
– FV11‐44 – 1‐off Separator skid, 4‐off Metering Skids, 3‐off Pipe Modules Skids
– FV10‐25 – 1‐off Separator skid, 3‐off Metering Skids, 2‐off Pipe Module Skid
– FV10‐26 – 1‐off Separator skid, 4‐off Metering Skids, 3‐off Pipe Modules Skids
– FV10‐29 – 1‐off Separator skid, 3‐off Metering Skids, 2‐off Pipe Module Skid
– FV11‐43 – 1‐off Separator skid, 2‐off Metering Skids, 1‐off Pipe Modules Skids
– FV18‐24 – 1off Separator skid, 1‐off Metering Skids