Client: Santos
Date: 2011
Hitec Welding Brisbane fabricated pipe spools, assembled and installed associated electrical and instrumentation equipment.
The mechanical piping class was 900lb (Schedule 160) with pipe wall thickness of 23mm. The pipe spool hydro-testing rage varied from 20,000kPa to 25,000kPa. Six mechanical skid packages were supplied in total.
The Hitec Welding Brisbane purpose workshop facility allowed for road-train transport to be utilised. The workshop facility has 6m high roller doors. The mechanical packages were all loaded safely with the use of the facility workshop over head cranes (lifting capacity 15T). Each mechanical packaged weighed approximately 14T and included Rotork Shut Down Valves, Emerson instrumentation, New-way Flow Control Valves.