Client: Santos GLNG / Fluor
Date: 2013
After an extensive tendering process HITEC Welding were awarded a multi-year contract for the supply of the following Coal Seam Gas Surface Production Equipment
-Inlet Metering Skid including electrical and instrumentation installation of Rotork Actuators, Multi Variable Transmitters, Flow Elements and Junction Box’s
-Well Head Piping
-Off Skid Pipe Supports
-Interconnection pipe spools
-Underground storage surface equipment (skid)
Associated project works commenced late 2012 and was completed mid 2014.